Emplex, from 2019 to 2021, provided technical management leadership for the Finch West LRT in Toronto, filling the role of Technical Director for Mosaic Transit Constructors which enabled the Design Build Consortium to advance during a period of personnel transition. During this term, Emplex oversaw all technical staff, coordinated technical aspects of procurement, reported to JV executives, provided management input, retained key additional staff and created critical technical management documents necessary including the Systems Engineering Management Plan and the Requirements Management Plan.
Once that role was complete, and successfully transitioned, Emplex was tasked with building the required Assurance program and team to verify it. This assignment included developing the Systems Assurance program and hiring and directing key personnel such as RAM Manager, Safety Assurance Manager, Configuration Manager and others and liaising with the Independent Safety Assessor. This was all done in a manner that allowed the successful back-filling of the lead position once the program had become self sustaining.