Emplex, working directly for the joint venture design-build Contractor, had direct responsibility for all technical aspects of this new 13km new LRT system in Canada’s capital. This included geometric control, alignment, temporary and permanent tunnel support, trackwork, elevated guideway, fixed facility design, LRT and automatic train control design, and establishing the testing and commissioning program.
Ottawa Confederation Line – Technical Director
